Home  History  Contact   Support   Software  Books  Forms  Order Forms  Downloads         
 
Back to Panel 2008
 

 Panel 2008      Features 

                     

SUB PANEL SCHEDULE OPTIONS

   
 -  Sub panel may have 2-84 circuits.
   
 -  Sub panel may be sized from 60 to 400 amps.
   
 - 
 

Sub panel may be 1-Phase or 3-Phase (WYE or DELTA).
   
 - 
 
You may connect a 1-phase sub panel to a 3-phase
panel.

   
 -  You may add a sub panel with or without transformer.
   
 -  Fault current calculations are optional. 
   
 -  Voltage drop calculations are optional. 
   
 -  Sub panel can have main breaker or main lugs only.
   
 -  You can specify minimum amps or let the program 
size the sub panel amps.
   
Feature Menu

Panel Schedule Options

Feeder Options

Sub Panel Options

Transformer Options
Continuous Loads

 Motor Loads 

Receptacle Loads

Kitchen Loads

General Loads

   

 

< BACK          NEXT>